Kortrijk_01 · POP_007
POP sheet: everything about this POP in one place.
Technical preparation
- Redesign
- OK
- Druktest
- OK
- POC/DP plaatsen
- OK
- Next delivery
- 28/03/2027
Construction
- Trenching
- 2 889.8 m · 59%
- Blaaswerk
- 58%
- Cables OK
- 14 / 24
- Left to blow
- 0 m · 0/0 finished routes
Blowing plans
📎 Legplan · 17/03 SharePoint
📎 All cables · 17/03 SharePoint
Synergies
No linked synergy.
Cables in SPER 1 · 679 m · KABELWERKEN
PDP010-020-025A288 · 679 m
Cables in synergy 0 · KABELWERKEN
No cable in synergy for this POP.
Cable routes 0 · open in Cable to plan →
No route for this POP.
Interventions 0
No intervention for this POP.