Tielt_01 · POP_008
POP sheet: everything about this POP in one place.
Technical preparation
- Redesign
- OK
- Druktest
- OK
- POC/DP plaatsen
- OK
- Next delivery
- 15/03/2027
Construction
- Trenching
- 7 313.8 m · 72%
- Blaaswerk
- 47%
- Cables OK
- 15 / 32
- Left to blow
- 0 m · 0/0 finished routes
Blowing plans
📎 Primaire 288 · 27/10 SharePoint
📎 Façade · 27/10 SharePoint
📎 Legplan · 29/10 SharePoint
📎 Feed 72 · 27/10 SharePoint
📎 Secondaire 96 UG · 27/10 SharePoint
Synergies
Synergy 18088216 ↗
01/02/2027-01/03/2027
Cables in SPER 0 · KABELWERKEN
No cable in SPER for this POP.
Cables in synergy 5 · 2 259 m · KABELWERKEN
Gipod 18088216 ↗ 01/02/2027-01/03/2027
040A96 UG · 159 m040B96 UG · 693 m045B96 UG · 211 m045C96 UG · 498 mPDP010-045-050A288 · 698 m
Cable routes 0 · open in Cable to plan →
No route for this POP.
Interventions 0
No intervention for this POP.