Tielt_01 · POP_008

POP sheet: everything about this POP in one place.

Technical preparation

Redesign
OK
Druktest
OK
POC/DP plaatsen
OK
Next delivery
15/03/2027

Construction

Trenching
7 313.8 m · 72%
Blaaswerk
47%
Cables OK
15 / 32
Left to blow
0 m · 0/0 finished routes

Blowing plans

Synergies

Synergy 18088216 ↗ 01/02/2027-01/03/2027

Cables in SPER 0 · KABELWERKEN

No cable in SPER for this POP.

Cables in synergy 5 · 2 259 m · KABELWERKEN

Gipod 18088216 ↗ 01/02/2027-01/03/2027
040A96 UG · 159 m040B96 UG · 693 m045B96 UG · 211 m045C96 UG · 498 mPDP010-045-050A288 · 698 m

Cable routes 0 · open in Cable to plan →

No route for this POP.

Interventions 0

No intervention for this POP.