Kortrijk_02 · POP_006
POP sheet: everything about this POP in one place.
Technical preparation
- Redesign
- OK
- Druktest
- OK
- POC/DP plaatsen
- OK
- Next delivery
- 15/12/2026
Construction
- Trenching
- 5 811.5 m · 84%
- Blaaswerk
- 96%
- Cables OK
- 23 / 24
- Left to blow
- 0 m · 0/0 finished routes
Blowing plans
📎 Legplan · 08/04 SharePoint
📎 All cables · 08/04 SharePoint
Synergies
Cables in SPER 0 · KABELWERKEN
No cable in SPER for this POP.
Cables in synergy 1 · 854 m · KABELWERKEN
Cable routes 0 · open in Cable to plan →
No route for this POP.
Interventions 0
No intervention for this POP.