Ingelmunster_01 · POP_002

POP sheet: everything about this POP in one place.

Technical preparation

Redesign
OK
Druktest
OK
POC/DP plaatsen
OK
Next delivery
30/11/2026

Construction

Trenching
13 073.5 m · 96%
Blaaswerk
94%
Cables OK
32 / 34
Left to blow
0 m · 0/0 finished routes

Blowing plans

Synergies

Cables in SPER 0 · KABELWERKEN

No cable in SPER for this POP.

Cables in synergy 2 · 2 630 m · KABELWERKEN

Gipod 19158487 ↗
020C96 UG · 1 076 m020D96 UG · 1 554 m

Cable routes 0 · open in Cable to plan →

No route for this POP.

Interventions 0

No intervention for this POP.