Kortrijk_01 · POP_001
POP sheet: everything about this POP in one place.
Technical preparation
- Redesign
- —
- Druktest
- OK
- POC/DP plaatsen
- To do
- Next delivery
- 15/11/2026
Construction
- Trenching
- 3 127.6 m · 56%
- Blaaswerk
- —
- Cables OK
- 0 / 0
- Left to blow
- 0 m · 0/0 finished routes
Blowing plans
📎 Legplan · 07/10 SharePoint
Synergies
No linked synergy.
Cables in SPER 0 · KABELWERKEN
No cable in SPER for this POP.
Cables in synergy 0 · KABELWERKEN
No cable in synergy for this POP.
Cable routes 0 · open in Cable to plan →
No route for this POP.
Interventions 0
No intervention for this POP.